Astbury Meadows

Astbury Meadows

Client
William Strike Ltd

     
Project Details

This project involved the construction of a coffee shop extension to the existing garden centre building. The works consisted of the removal of asbestos sheet roof cladding and replacement with steel composite cladding. An existing timber canopy structure affixed to the side of the existing glasshouse was then enclosed to form the extension.

The main works included general groundworks, drainage, glazed frontages, roof works, internal partitioning and finishes, general internal fixtures and fittings, mechanical and electrical installations and some minor external works.